In addition to selection, maintenance and other work, the stainless steel sewage pump in the course there are 13 tips to note that this greatly improved the use of stainless steel sewage pump efficiency and life.
Diving sewage pump efficient use of skills
1, in order to prevent siltation blockage, the pump outlet end can be set up self-cleaning nozzle, the use of pump outlet pressure water scattered near the suction port sediment. , 2 automatic coupling interface plus sealing tape, to prevent the interface leakage.
2, to improve the machining accuracy of casting to ensure that the pump can be fully coupled after sliding.
3, to improve the strength of the slide, the size of the slide should increase with the weight of the pump increased.
4, in order to facilitate pulling, the pump should be increased on the two side wheels, in order to achieve good guidance.
5, float, wire should be oil, corrosion, high temperature, to meet the requirements of different water quality. , & Lt;
6, the addition of locating pin on the slide, so that the pump can be pulled to a certain height maintenance.
7,5.5 KW or more submersible sewage pump at the top of the slide should be set up mechanical lifting device.
8, design selection should be reasonable. Set the size of wells should be calculated according to the system to determine the exact displacement. On the hotel, the kitchen, laundry, workers shower, swimming pool displacement is very large, set wells should not be too small, or pump start and stop too frequently. The depth of the collection well should ensure that the pump is submerged at a low water level by a factor of two thirds. For the kitchen, fecal sewage is the best choice of larger diameter pump, so as not to plug.
9, the drainage pipe should be access to the lower part of the water collection wells, so as not to impact the float and generate large noise.
10, because the wells are often scattered layout, management is too much trouble, and once the sewage overflow are more serious. Therefore, even if there is a set of automatic control devices, should also set up remote control center in order to focus on monitoring the work of the pump.
11, the pump cable should be introduced from the top, so no line under working conditions, without affecting the pump.
12, deep well set when the slide should be strengthened, and to ensure that no vertical deformation.
13, set around the pump trash grille, so as not to attract large particles of dirt.
In short, as long as the manufacturers, design units, installation units and the use of units work together, it will make submersible sewage pump in the project to achieve reliable automatic control, better for people's work and life services.
没有评论: