Axial flow pump preparation before commissioning
1 to confirm the axial flow pump unit overhaul or installation is completed, the quality of Shanghai Weihu pump installation procedures in line with the requirements of a complete record, accurate, finished material net, clean the site.
2 instrument control system is complete and accurate.
3 electrical system, ground connection is connected, turn right.
4 Lubrication system to join the qualified lubricant (Jinan TEDA pump recommended you use high-quality lithium-based lubricant), lubrication conditions meet the requirements.
5 cooling water flow, exhaust, sewage is completed.
6 pool filled with water to the specified level.
7 packing tightly appropriate, to the stuffing box continuous injection of water or soapy water lubrication rubber bearings, axial pump to run properly, fill the water to stop filling water.
8 car inspection, flexible rotation, no abnormal phenomenon.