Site Installation Procedure for Deep Well Pumps
The steps of on-site assembling when the deep well pump is transported separately:
1, before the installation of vertical motor vertical release, open the vent hole and water injection hole, pay attention to the two water blocks are open, fill the water filling and water blocking plug tightened to observe whether the motor leakage.
If the phenomenon of leakage can not go down, the reason may be bumps in the transport process which should be promptly contact the agent or manufacturer to resolve until the leak (observed 10 to 15 minutes). And then shake the motor insulation resistance, its value is not less than 50 megohm.
2, wrap the cable connector, wrap and try the motor after the steering, the motor steering pump on the direction of the arrow is the same, and do a good mark continued.
3, the deep well pump to put the appropriate container to pump the export plus washing powder water, while a little jog about the motor start button carefully observe the pump turn, the time shall not exceed 2 seconds, do a good mark continued.