Submersible pump installation steps:
1. After the opening, due to check the electric pump and accessories die not complete. Choose the pump nameplate parameters meet the operational requirements.
2. With hard steel wire hose or PVC pipe, metal tap water pipe, connecting pipe import and export pipeline, pay attention to the caliber match, and the interface hoop tight, to ensure that the joint gas phase sealing.
3. Choose the right place to place or fix the pump. Pump body should be placed in the right place.
4. According to the different situation of the pump, with reference to such pump before use requirements, completes the boot before the water supply, suction and discharge air in the water pipe, open the faucet and other preparatory work.
5. Close the power supply, a moment pump that can water.
没有评论:
发表评论